Pipelines Laying in Water Bodies

Depending on the water bodies, we use one of the two methods to lay pipelines, which are

Open-cut crossing involves the digging of trenches on the floor of water body to house the pipe. Pipe can be encased or pipe can have RCC blocks which acts as a ballast and works against buoyancy.

Laying of 1000mm dia, 1200 Mtrs Seawater Outfall HDPE Pipeline

Meenakshi Power Plant

Laying of 1400mm and 1600mm dia HDPE Pipeline for 2*660 MW

NCCPPL Works

Laying of 1800mm dia 1600 Mtrs long MS Seawater Intake and Outfall Pipeline

APPDCL