Projects handled by Kolli Projects

1. Offshore logistics, Pipeline and dredging support for Navayuga Engineering for AP GENCO, Nellore phase II
Successfully completed the assembly, pulling, and laying of a 1800 mm diameter,1250 Meters Long seawater outfall MS pipeline,for post-trenching dredging support

2. Pipeline and dredging support, and flotilla for Navayuga Engineering for Meenakshi Power Plant, Nellore - 2018/19
Successfully completed the Assembly, Towing, and Sinking of a 1000 mm diameter HDPE pipeline with a length of 1200 meters of seawater outfall line, with the use of appropriate Flotilla.

3. Pipeline Assembly, Pulling and laying support flotilla for Navayuga for APPDCL, Nellore
Successfully completed the Assembly, Pulling and laying of MS pipeline of 1800 mm dia with a length of 1600 meters with trench dredging and Appropriate Flotilla for stage 1, unit 1 & 3 APPDCL, Nelaturipalem, Nellore, AP

4. Assembly, pulling and laying flotilla support of sea water outfall for Navayuga for NCCPPL - 2013
Successfully Accomplished Assembly ,Pulling and Laying of SWIO HDPE pipeline 1600mm dia, length of 1400 metres Intake, 1400mm Dia and length of 1200M with Flotilla support for 2x660 MW NCCPPL, Nelaturipalem.

5. Bathymetry survey Support Flotilla Sea water outfall system for Hinduja National Power Corporation Limited at Mandala Valasa, Visakapatnam

6. Logistic Support for Pipeline maintenance work for BRANDIX, Pudimadaka for Flowline Pvt Ltd

7. Logistic Support for Pipeline for LYFIUS, AV Nagaram for Flowlines Pvt Ltd

8. Extensive steel renewal of 250 tons for Dredger-1 and Dreedger-3,Navayuga at Krishnapatnam Port, Nellore

9. Pipeline support for Deccan Chemicals, Kesavaram, Tuni in 2017 - 2018 along with SS Kivia AGRO TECH

10. Flotilla for IOCL at PARADIP PORT, Orissa in 2017 along with Flowlines Pvt Ltd

11. Flotilla for Pipeline Project for BRANDIX, Pudimadaka in 2015 along with Flowlines Pvt Ltd

12. Flotilla for ONGC pipeline at Kesanpally for Hydrotech Solutionsin 2022

13. Flotilla for Divis Labs for Affluent Release pipeline for SSKIVYAin 2023

14. Flotilla for Hetero Labs for SSKIVYA in 2023 for Affluent Release Pipeline

Ongoing Projects

1. Dredging & Logistics Support for Snexa Projects at naval dockyard at Visakhapatnam Port

2. Offshore logistics supply for Viswasamudra Engineering for stone Filling at Sagarmala project at Kakinada Port limit

3. Steel Renewal for Dredger 1, Navayuga Engineering at Krishnapatnam Port, Nellore